Eskom ‘clarifies’ stage 13 load shedding warning for South Africa

  • 📰 BusinessTechSA
  • ⏱ Reading Time:
  • 22 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 12%
  • Publisher: 61%

المملكة العربية السعودية عناوين أخبار

المملكة العربية السعودية أحدث الأخبار,المملكة العربية السعودية عناوين

A recent report from independent experts flagged over 13,000MW of energy generation being at risk on South Africa’s grid – but Eskom disagrees.

A report by German consultancy group VGBE Energy warned that Eskom needs to repair and upgrade its water treatment plants urgently or face losing over 13,000MW – the equivalent of 13 stages of load shedding – from the grid.came from a report that the National Treasury commissioned to analyse the performance of Eskom’s coal-fired power plants and recommend how they can be improved.

According to the report, Medupi and Matimba power stations rely on a shared raw water treatment plant, which is currently in a state of disrepair and unable to supply both stations at full capacity. The water treatment plant at Kendal is also in poor condition and needs urgent maintenance and refurbishment. If that plant fails, six units – 3,840 MW of capacity– would be offline.13,640 MW of generation would go offline

 

شكرًا لك على تعليقك. سيتم نشر تعليقك بعد مراجعته.
لقد قمنا بتلخيص هذا الخبر حتى تتمكن من قراءته بسرعة. إذا كنت مهتمًا بالأخبار، يمكنك قراءة النص الكامل هنا. اقرأ أكثر:

 /  🏆 24. in SA

المملكة العربية السعودية أحدث الأخبار, المملكة العربية السعودية عناوين